Investment Plan

The actions planned will lead us to achieve a highly functional and operational railway network, based on safety and quality, where 40% of the said network will be provided with double lines (compared with 15% currently), a figure that is more in line with the important volume of traffic supported.
The total distribution of investments planned for the Strategic Plan EuskoTren XXI (161,860 Million pesetas), is as follows:
PROGRAMME
MILLIONS OF PESETAS
EuskoTren Programme 108.111
Tram Service Programme 28.749
New Railway Network 25.000
TOTAL INVESTMENT EuskoTren XXI
161.860
(972.79 Million Euros)
Economic distribution of the EuskoTren Programme
Planning and the Environment 1.200
Railway Network Operations 71.966
Corporate Organisation Operations 2.461
Railway Passenger Operations 18.300
Road Passenger Operations 2.117
Goods Operations 10.817
Rural Transport 1.250
TOTAL
108.111
(649.76 Million Euros)

Tram Service Programme


One of EuskoTren’s strategic objectives is to encourage and participate in the implementation of tram transport systems, also known as “light metro systems”, in the urban areas with high mobility levels.
  • Bilbao
    Infrastructure
    Rolling Stock (8 units)
  • Leioa – Universidad
    Infrastructure
    Rolling Stock (9 units)
  • Vitoria-Gasteiz
    Infrastructure
    Rolling Stock (6 units)
  • Donostia-San Sebastián
    Infrastructure
    Rolling Stock (12 units)
  • Txingudi
    Infrastructure
    Rolling Stock (7 units)
  • Deba
    Infrastructure
    Rolling Stock (35 units)
  • Txorierri
    Rolling Stock (6 units)